About the project

  • Project was a slab waterproofing project in Nuwara eliya,Sri Lanka.
  • Client wanted us to finish immediately within 4 days.
  • Initially site was inspected and project plan has created.
  • Weather forecast continuously followed.

Initial Inspection

  • Dust and concrete wasts collected on the slab.
  • Small cracks observed on the concrete surface.
  • Construction joints were thourouly inspected.

Crack repairing

  • Initially surface was cleaned and washed with high pressure and dust was completely removed by compressor.
  • Observed cracks were cut by ‘T’ cut.
  • QS 510 construction grout used to treat cracks.

waterproofing

  • Waterproofed using QS 102.
  • 8 hours kept between two coats.
  • 500 m2 slab was done with 20 QS 102 buckets.

  • Nuwara Eliya Hotel Waterproofing project
    Waterproofing

  • Waterproofing