Nuwara Eliya Hotel Waterproofing project
- Home
- Nuwara Eliya Hotel Waterproofing project
About the project
- Project was a slab waterproofing project in Nuwara eliya,Sri Lanka.
- Client wanted us to finish immediately within 4 days.
- Initially site was inspected and project plan has created.
- Weather forecast continuously followed.
Initial Inspection
- Dust and concrete wasts collected on the slab.
- Small cracks observed on the concrete surface.
- Construction joints were thourouly inspected.
Crack repairing
- Initially surface was cleaned and washed with high pressure and dust was completely removed by compressor.
- Observed cracks were cut by ‘T’ cut.
- QS 510 construction grout used to treat cracks.
waterproofing
- Waterproofed using QS 102.
- 8 hours kept between two coats.
- 500 m2 slab was done with 20 QS 102 buckets.